Service work · 200 amps

If the house needs 200 amps, call a 200 amp crew.

We heavy-up services to 200A: new meter socket, new main, grounding electrode, and a utility day that actually happens. Built for EV, solar headroom, and kitchens that finally got the range they wanted.

Heavy-up steps Domain for sale
200-amp service mast, meter, and new panel

The service

Everything between the pole and the bus

200A service heavy-up

Riser or lateral, new main breaker, torque, and a label that matches what the utility just set.

Meter socket upgrade

Ringless or ring-type to current utility spec. We do not reuse a burned jaw and call it done.

Grounding electrode

Rods, Ufer, water bond, intersystem. The part that fails inspection when someone rushed the panel.

Utility coordination

We file the service change, schedule the cut, and stand there when the lineman lands.

100A to 200A

The classic residential jump. Panel, mast, and grounding as a package — not three change orders.

EV / solar headroom

A 200A bus with space and rating left for a charger and a production breaker. Plan it once.

Why this name

The domain does the selling

  • hello@200ampcrew.com is an inbox that is the offer. Homeowners type the amperage first.
  • Exact-match Google for “200 amp crew.” The number is the brand.
  • Truck door: giant 200A. You do not need a second line of type.
  • Buyer keeps a heavy-up contractor homepage with the number already doing the marketing.

Domain for sale

Buy 200ampcrew.com

Asking $995 or best offer. A buyer can keep this homepage, put their license and yard on it, and start taking calls on a name that already means the trade.

Send offer